RV
Sh. R. K. Verma
Chief Controller · MGS

Explainable AI Center

Every prediction broken down by factor — auditable, transparent, decision-ready.

Prediction · BOXN-32145

Predicted ETA
17:55 hrs
Confidence
89%
Total Time
4h 22m
FactorMinutesShare
Base Running Time200
76.3%
Corridor Waiting (MGS-DDU)25
9.5%
Crew Change at MGS8
3.1%
Speed Restriction CO-2026-44110
3.8%
Interchange Queue (MGS)12
4.6%
Passenger Path Conflict7
2.7%

Global Feature Importance

Narrative Explanation

Train BOXN-32145 is predicted to arrive at 17:55 hrs with 89% confidence. The dominant factor is the base section running time on the DHN-STL-ASN-UDL inbound route. Secondary contributors are corridor waiting on STL-ASN (high passenger train density between 14:00–17:00) and an active caution order (CO-2026-441) imposing 30 km/h restriction at Sitarampur yard. Crew change at STL adds 8 minutes; interchange queue of 14 rakes at Sitarampur adds 12 minutes. Passenger paths 12303 Poorva Express and 13007 U.A. Toofan currently dictate the next available window into ASN.