RV
Sh. R. K. Verma
Chief Controller · MGS

Asansol Division · Daily Operations Center

Operational inputs feeding the inbound-goods ETA engine · 26-Jun-2026

Daily Master Chart
Loaded
Manual + Excel
Last sync 14:00412 paths
Current Caution Orders
Loaded
Manual entry
Last sync 13:3038 active
Current Train Position
Loaded
FOIS-ready
Last sync 14:22248 trains
Interchange Status
Loaded
Manual + CSV
Last sync 14:156 points
Section Occupancy
Loaded
FOIS-ready
Last sync 14:2247 sections
Crew Availability
Loaded
COA-ready
Last sync 13:501,124 crews

Active Caution Orders · 26-Jun-2026

CO IDSectionKM FromKM ToSpeedReasonValid TillIssued By
CO-2026-441STL-ASN198/3199/530 km/hTrack renewal at Sitarampur yard30-Jun-2026ASN Div (ER)
CO-2026-442ASN-UDL (Andal)205/0206/445 km/hPoints & crossing renewal28-Jun-2026ASN Div (ER)
CO-2026-443BWN-DGR158/2160/125 km/hGirder bridge inspection05-Jul-2026ASN Div (ER)
CO-2026-444HWH-BWN88/690/050 km/hPermanent way works02-Jul-2026HWH Div (ER)
CO-2026-445ASN-MDP (via JSME)42/443/640 km/hOHE mast work27-Jun-2026ASN Div (ER)

Speed Restrictions (from COA)

PSR (Permanent Speed Restrictions) are auto-synced from the COA API. TSR (Temporary Speed Restrictions) are entered and updated manually by Controllers as ground conditions change.
TypeIDSectionKM FromKM ToSpeedReasonSourceUpdated ByUpdated
PSRPSR-ER-018STL-ASN196/0197/260 km/hPermanent curve restriction at SitarampurCOA APICOA Sync26-Jun 06:00
PSRPSR-ER-044BWN-DGR155/4157/875 km/hGirder bridge — permanent SRCOA APICOA Sync26-Jun 06:00
PSRPSR-ER-011HWH-BWN84/085/665 km/hLevel crossing zoneCOA APICOA Sync26-Jun 06:00
TSRTSR-2026-441STL-ASN198/3199/530 km/hTrack renewalManual entrySh. S. Mukherjee (Sr.DOM/ASN)26-Jun 13:12
TSRTSR-2026-442ASN-UDL205/0206/445 km/hP&C renewal at AndalManual entrySh. R. K. Verma (Ch.CTNL/ASN)26-Jun 11:48
TSRTSR-2026-443ASN-MDP42/443/625 km/hOHE mast workManual entrySh. R. K. Verma (Ch.CTNL/ASN)26-Jun 09:30

Integration Readiness

FOIS Integration
Ready
Push/pull rake movement events
COA MIS Integration
Ready
Crew roster, allocation, change events
GPS Integration
Planned
Real-time loco positions
COA PSR API
Ready
Auto-sync Permanent Speed Restrictions
TSR Manual Entry
Ready
Controllers update Temporary SRs on the fly